The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16516

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 日韩精品欧美激情亚洲综合 | 忘忧草成片 | 国产精品最新在线观看 | 噜噜噜噜天天狠狠 | 国产欧美日韩精品第一页 | 麻豆视传媒| 国产精品不卡一区二区三区在线观看免费在线观看高清完 | 成年人免费黄色片 | 精品国产亚洲av麻豆映画 | 日本不卡免费视频新二区 | 久久婷婷五月综合色丁香 | 亚洲欧美综合中文字幕另类 | 自拍一区 综合图区 | 国产亚洲福利精品一区二区 | 中文字幕一区二区三区在线视频 | 黄AV国产永久免费网站 | 美女黄频网站一区二区三区 | 国产伦精品一区二区三区视频v | v天堂v手机在线 | 亚洲AV成人片色在线观看高潮 | 欧美日韩精品一区二区在 | 制服丝袜亚洲中文综合 | 欧亚精品码1码2一码3码 | 免费大片一级a一级久久无码 | 国产乱子伦视频大全亚琴影院 | 国产亚洲av手机在线观看专区黑人高潮av电影 | 草草影院精品一区二区 | 久久国产36精品色熟妇 | 国产免费黄色网址 | 亚洲一区在线观看视频 | 欧美一区二区另类在线播放 | 精品人妻无码一区二区三区牛牛 | 亚洲欧美一区二区三区国产另类 | 特级毛片在线大全免费播放 | 久久精品综合国产二区 | 久久天天躁狠狠躁夜夜躁2014 | 久久久www影院人成 久久久爱毛片一区二区三区 | 国产精品不卡在线一区二区 | 国产精品密播放国产免费看 | 亚洲vs成人无码人在线观看堂 | 色撸撸|