亚洲国产欧美日韩v一区二区-亚洲国产欧美日韩激情在线-亚洲国产欧美日韩精品一区-亚洲国产欧美日韩精品一区二-亚洲国产欧美日韩精品一区二区-亚洲国产欧美日韩另类

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16516

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 国产精品久久久久国产三级无码 | 囯产A片又粗又爽免费视频 囯产丰满肉体A片 | 禁断肉体乱爱中文字幕 | 亚洲欧洲一区二区 | 一级待黄网站免费视频 | 久久久精品久久久久久久久久久 | 久久久久亚洲av无 | 成人图片视频在线91小视频在线观看 | 精品国产一区二区三区香蕉欧美 | 久久久国产精品福利免费 | 国产大屁股av在线播放 | 中文字幕视频在线区一区二 | 一级二级毛片 | 亚洲欧美综合在线天堂 | 欧美写真视频一区 | 亚洲一区免费在线 | 丰满熟女人妻大乳波多野吉衣 | 亚洲bt区 | 伊人久久精品无码av一区 | 国产成人精品综合久久久免费观看 | 91精品免费久久久久久久久 | 成人亚洲a片v一区二区三区色欲 | 国色天香精品一卡二卡三卡四卡 | av一本久道久久波多 | 视频一区国产 | 亚洲不卡护士高清av | 国产精品成人免费视频 | 国产亚洲精品自在线亚洲情侣 | 国产精品不卡一区二区三区在线观看免费在线观看高清完 | 91在线精品免费免费播放 | 国产一区二区久久精品哟 | 国产成人久久av免费高清 | 亚洲日本va一区二区三区 | 日韩精品成人av高清在线观看 | 精品无码久久久久久久久 | 乱色熟女综合一区二区三区国产人成亚洲综合无码aⅴ蜜桃 | 69SEX久久精品国产麻豆 | 亚洲午夜在线视频观看 | 精品成人欧美久久久 | 精品无码中文字幕网站 | 欧美另类精品xxxx孕妇 |