Engineering generalcontractor

Shanghai industrial boiler is also committed to providing customers with energy conservation and environmental protection boiler project package solution.

Power station boiler EPC package
Shanxi Gaoyi Iron and Steel Co., Ltd. 15MW high temperature and extra high pressure gas power generation project
Unit operation mode:

A 190t/h high-temperature ultra-high pressure gas boiler (blast furnace gas mixed with converter gas) +1 15MW high-temperature ultra-high pressure back pressure steam turbine unit, steam turbine back pressure parameters: 3.9MPa (a), ~ 373 °C. The back pressure of the steam turbine is returned to the boiler reheater, and the steam temperature is raised to 450 ° C and sent to the steam blower of the steel mill.

Fuel fuel:Mixed gas of blast furnace gas and converter gas
Ignition method:Liquefied gas ignition

In principle, the boiler operates at base load, but has variable load peaking capability. The boiler has good adaptability to the sliding pressure operation and the constant pressure operation.

The time from ignition to full load of the boiler meets the following requirements under normal starting conditions:

Cold start (stop more than 72h)6~8 hours

Warm start (stop 10-72h)3~4 hours

Hot start (within 10 hours of shutdown)1.5~2 hours

Temperature adjustment method:The superheated steam is cooled by two-stage water spray; the reheated steam is cooled by a small amount of water spray.

The service life of the boiler is 30 years, and the life of the convective heating surface flushed by the smoke is more than 120,000 hours. The overhaul interval is 5 years.

The project has been put into operation according to the installation, and all the indicators have reached the predetermined requirements.



Boiler modification

Shanghai industrial boilers can be retrofitted by assembling a Seiko retrofitting team, which can be customized according to customer requirements according to local conditions.

With the continuous improvement of national energy policy and environmental protection requirements, Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. have carried out in-depth research and development on the transformation of coal-fired boilers.

Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. are willing to customize various boiler renovation solutions for the majority of users.
In order to improve the performance of the original boiler and reduce the emission concentration of the boiler, for the country's energy-saving and environmental protection cause to make due contributions.


Equipment installation

The quality of the engineering installation directly determines its effect after being put into use.

×
主站蜘蛛池模板: 中文字幕国产91在线手机版 | 色综合亚洲色综合网站 | 亚洲中文精品久久久久久蜜臀 | 亚洲中文字幕永久在线全国 | 亚洲国产精品二区久久 | 亚洲一区在线观看视频 | 亚洲欧美制服在线日韩 | 久久免费国产 | 国产高清精品在线91 | 精品一区| 可以在线看黄的网站 | 1024你懂得久久久久久久 | 亚洲 综合 校园 欧美 制服 | 成人无码区免费a片视频调教综合一个 | 精品人妻午夜一区二区三区 | 一级在线观看 | 日本高清免费中文在线看 | 国产又色又爽又黄又免费软件 | 久久久久精品亚洲 | 韩国精品福利一区二区三区 | 加勒比AV一本大道香蕉大在线 | 无码aⅴ一区二区三区a片 | 日本免费一区二区三区最新 | 欧洲精品免费一区二区三区 | 天天干天天干天天 | 成年美女视频网站免费大全 | 91精品欧美综合在线野草社区 | 精品人无码一区二区三区 | 无码av一区二区在线观看 | 精品人妻系列无码人妻在线不卡 | 久久综合精品国产二区无码 | 亚洲欧美国产国产综合精品一 | 久久97久久 | 国产精品第1页在线播放 | 911国产影院在线观看 | av资源每日更新网站在 | 亚洲国产精品一区二区国产 | 国产精品久久久精品无码 | 久久久久高潮毛片免费 | 久久国产露脸精品国产 | 日本三级床震 |